
Production and assembly site
Koa Denko Factory
Koa Denko Factory
Key facts
Location
Malaysia, MalaccaDelivery
September 2024
Cient
Koa Denko Sdn Bhd
General contractor
Kajima (M) Sdn Bhd
Specialized contractor
VSL International
Pre-stressed slabs for the new Koa Denko Factory
To support Koa Denko's industrial expansion in Malaysia, VSL designed and constructed the prestressed slabs for the four levels of the new 84,000 m² complex. During the design phase, the teams optimised the floor system to reduce materials and improve structural efficiency.
Thanks to this prestressing design, the amount of steel was reduced and the thickness of concrete decreased, generating significant savings and a lower carbon footprint — a key asset for more sustainable construction.

Key figures
- 84,000
- m² (area of the new site)
- 4
- levels of pre-stressed floors
- 221
- tonnes of installed prestressing
Do you have a project?
Let's discuss it.
Optional country selection. This information will be sent with your request.
Continue without country selection
Join us!
Hundreds of opportunities available worldwide.
