Key facts

  • Location

    Chile, Tarapacá Region
  • Date of completion

    February 2022

  • Owner

    TECK

  • Main contractor

    EIMISA

  • Specialized company

    VSL

A robust stockpile wall for a major Chilean copper mine

The Quebrada Blanca Phase 2 project is one of the world’s largest undeveloped copper resources, with a planned mine life of 28 years and strong potential for future expansion. As part of the development of a new processing plant and related facilities, main contractor EIMISA selected VSL Chile to build a new stockpile wall. 

The structure consists of 151 precast concrete segments, assembled and tensioned on site to form a strong circular wall — only the second of its kind in Chile to use this post-tensioned precast design. 

To meet the project’s technical and environmental challenges, VSL engineered a solution that ensures long-term stability and seismic resistance, crucial in this highly active region.

Vue aérienne d'un vaste chantier industriel avec une base circulaire en béton et de la machinerie lourde.

Key figures

  • 151
    precast wall segments
  • 63
    tonnes - post tensioning tendons
  • 11
    post-tensioning tendons
  • 7.8
    m - wall height
Skip the slider

Our projects

Do you have a project?
Let's discuss it.

Optional country selection. This information will be sent with your request.
Continue without country selection

Join us!

Hundreds of opportunities available worldwide.
This button will open a new window with the search results