
Bouygues Travaux Publics UK
Bouygues Travaux Publics UK
Building low-carbon energy production and public transport infrastructure in the UK
Who we are?
As part of Bouygues Construction, Bouygues Travaux Publics UK delivers high-profile major infrastructure projects in the UK, uniting our teams with the greatest and most exciting responsibility of all: building for life.
For our customers, we deliver much more than projects.
We are aware that everything we build is here to stay and our legacy as builders will be with us for generations to come.
We support nationally significant infrastructure, in particular the development of low-carbon energy production (EPR Hinkley Point C and EPR Sizewell C) and public transport infrastructures (High speed line HS2 and tunnel Lower Thames Crossing).
We ensure that everyone is safe at all times, and that human rights and ethical standards are respected. We have strong Health, Safety, Wellbeing and quality systems aligned with UK regulatory expectations. A well-established safety culture, shared by all Bouygues Travaux Publics employees throughout the world, where each individual demonstrates leadership for their own safety and that of their colleagues.

Our greatest strength is our people.
Our teams are the foundation of every successful project. Their expertise, passion and commitment drive each project forward from concept to completion.
A skilled workforce, experienced engineers and dedicated support staff all bring unique knowledge and problem-solving abilities to the table, ensuring that every detail is managed with care and precision.
Their passion for building for life fuels innovation and fosters a strong sense of teamwork, enabling them to overcome challenges and achieve outstanding results.
.webp)
Key figures
- £1,1 billion
- of turnover
- 24
- activities
- 1.000
- collegues
Our references

High Speed 2 (HS2)
Between London and Birmingham, as part of the Align consortium, we built 21.6 km of infrastructure, including a 16 km twin-tube tunnel and a 3.4 km viaduct.
.webp&w=2560&q=75)
Colne Valley Viaduct
An iconic structure of the HS2 project. At 3.4 km long, it is the longest railway viaduct in the United Kingdom.

Hinkley Point C EPR
Construction of two EPR reactors in the UK, supplying 7% of national electricity. A project of exceptional scale.
Do you have a project?
Let's discuss it.
Governance
Bouygues Travaux Publics UK, the UK arm of Bouygues Travaux Publics.
Bouygues Travaux Publics is an expert in designing and delivering complex civil engineering projects, offering sustainable and innovative solutions, in four sectors::
- Mobiliy: metro, train, road, road and rail bridges, river canals, footbridges.
- Low carbone energy: civil engineering of EPRs, wind turbine foundations, dams, all BCEN activities.
- Natural Resource Management: dams, drainage tunnels and CSO (Combined Sewer Overflow), mining activities, LNG (Liquefied Natural Gas) reservoirs.
- Sustainable development and infrastructure: offshore extensions, dikes and seafronts, footbridges and eco-bridges, port developments, lane covering projects, renaturation projects.
As the UK subsidiary of Bouygues Travaux Publics, we operate globally and are widely known for our expertise in managing large-scale public-works projects with high added value.
We have experience in nuclear-grade civil structures globally and currently at Hinkley Point C and Sizewell C in the UK. With proven capability in complex logistics and phasing.

Committed to a sustainable future
Recognising our responsibility to our communities and the planet, we place environmental management and carbon reduction at the heart of our operations. From innovative construction methods to responsible sourcing and energy-efficient designs, we strive to minimise our environmental footprint while creating lasting, positive legacies for future generations.

