Dobrée Museum
Dobrée Museum
Key facts
Location
France, NantesProject owner
Department of Loire-Atlantique
Architect
Atelier Novembre
Contractor
Bouygues Bâtiment Grand Ouest
The revival of an iconic heritage site in the heart of Nantes
Over a period of 26 months, seven construction projects were carried out simultaneously by teams from Bouygues Bâtiment Grand Ouest to restore the existing historic buildings of the Dobrée Museum: the 19th-century Dobrée house, the 15th-century manor house, and the 1970s reception building. and to construct two new extensions to the manor house and visitor center, as well as the technical galleries connecting the three buildings. The outdoor areas were also completely redesigned to be transformed into gardens open to the city.
Launched in October 2021, the restructuring work consisted in particular of repairing the roofs with tiles, nailed slates, standing seam copper, and stones identical to those existing on the Palace and the Manor. The roofs were removed and replaced with the same model, respecting the details of the original construction.

The revival of an iconic heritage site in the heart of Nantes
Over a period of 26 months, seven construction projects were carried out simultaneously by teams from Bouygues Bâtiment Grand Ouest to restore the existing historic buildings of the Dobrée Museum: the 19th-century Dobrée house, the 15th-century manor house, and the 1970s reception building. and to construct two new extensions to the manor house and visitor center, as well as the technical galleries connecting the three buildings. The outdoor areas were also completely redesigned to be transformed into gardens open to the city.
Launched in October 2021, the restructuring work consisted in particular of repairing the roofs with tiles, nailed slates, standing seam copper, and stones identical to those existing on the Palace and the Manor. The roofs were removed and replaced with the same model, respecting the details of the original construction.

Key figures
- 26
- months of construction work
- 7
- construction sites
- 10 655
- hours of social integration
Gallery
Our projects

AsiaWorld-Expo
The venue with the largest exhibition capacity in Hong Kong, hosting international trade shows, conferences, and concerts.
.webp&w=2560&q=75)
Bourse de Commerce
Major restoration of the museum combining preservation of the existing structure with modernization.

Dobrée Museum
In Nantes, the transformation of an iconic heritage site: seven construction projects carried out over 26 months to restore the existing historic buildings.
.webp&w=2560&q=75)
Les archives du Loiret
A modern 13,000-square-meter building featuring sustainable architecture made of bio-based wood and green roofs, designed as a cultural and heritage “third place.”
.webp&w=2560&q=75)
Yves Saint Laurent museum
An iconic museum in Marrakech, combining Moroccan craftsmanship and the highest standards to preserve the couturier's creations.
Do you have a project?
Let's discuss it.